CASE STUDIES
Home // Case Studies // Double Stacking MainsBoost
Paynes Heating had a nice little problem to solve at the LandHurst Estate in Hatfield. How to provide sufficient water pressure and flow to 6 ensuite bathrooms fitted with the very latest in shower appliances?

The installed system had to allow for all the showers to be run at the same time and was part of an extensive rennovation of the property.

To supply sufficient hot water to meet demand 2 AquaStor Sigma 300 F1  Unvented hot water cylinders were installed which were linked with 4 MainsBoost MB450 units to stabilise the water pressure and maintain a constant flow of water to all appliances.